Speed, Scale & Standards: 15,000㎡ Steel Warehouse for a Leading E-Commerce Hub in Southeast Asia

In mid-2024, Global Brothers International was commissioned by a top-tier e-commerce logistics provider to design and supply a 15,000-square-meter steel warehouse in an industrial park near Ho Chi Minh City, Vietnam. The facility would serve as a regional fulfillment center, requiring rapid construction, high clear height, and compliance with international fire and structural codes.

Challenges

  • Aggressive timeline: Client needed the building shell completed in just 10 weeks to meet peak-season demand
  • High operational requirements: Minimum 12m clear height for automated racking and AGV robots
  • International standards: Must comply with American AISC 360 and FM Global fire safety guidelines
  • Local coordination: Limited local engineering support; all drawings required bilingual (English/Vietnamese) approval

Our Solution

Global Brothers delivered a design-fabricate-ship package from Shanghai, leveraging prefabrication and digital coordination to compress the schedule without compromising quality.

✅ Structural Design & Fabrication

  • Clear-span portal frame system (no interior columns)
  • Main frames: Q355B high-strength steel, hot-dip galvanized
  • Roof & wall cladding: 0.6mm PPGI with thermal insulation layer
  • Designed for 12.5m eave height, 15m ridge height
  • All connections pre-drilled and labeled for rapid assembly

✅ Compliance & Coordination

  • Structural calculations certified per AISC 360-16
  • Fire resistance achieved via non-combustible insulation and FM-approved roof assembly
  • BIM model shared with client and local contractor for clash detection
  • Full set of shop drawings delivered in English and Vietnamese

Results

  • 🏗️ Steel structure erected in just 8 weeks—2 weeks ahead of schedule
  • 📦 Zero rework on site thanks to precision fabrication and clear documentation
  • 🔥 Passed third-party fire safety audit by FM Global representative
  • 💬 Client feedback: “Global Brothers’ turnkey steel solution gave us the speed we needed without sacrificing safety or quality.”
  • 🌱 Energy-efficient design reduced daytime lighting needs by ~25% through skylight integration

Strategic Impact

This project demonstrates how Global Brothers enables global e-commerce and logistics players to scale infrastructure rapidly across emerging markets—with the reliability of international engineering and the efficiency of integrated supply.

Built for speed. Engineered for trust.

Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *